View Rate

Basic Information
Utility Name
Progress Energy Carolinas Inc (South Carolina)
EIA Id
5416
Rate Name
Residential Service Time-of-Use with Critical Peak Pricing(R-TOU-CPP) Three Phase
Expert Has Verified
Yes
Is Default
 
Effective Date
02/01/2026
End Date
 
Supersedes
 
Sector
Residential
Service Type
Bundled
Description
This Schedule is available when electric service is used for domestic purposes in and about (1) a residential dwelling unit, including electric vehicle charging, and electric service used on a farm and in the preparation of the farm's products for market. A residential dwelling unit served under this Schedule may be used as a boarding house, fraternity house, tourist home, or like establishment, provided such residential dwelling unit is one which ordinarily would be used as a private residence. Detached garages, barns, or other structures that are primarily used for residential purposes that are located on the same premise as the separate residential dwelling unit may be served under any applicable Residential Schedule as of April 1, 2023. Service under this Schedule is not available for processing (or handling) for market of farm products produced by others; for separately metered domestic or farm operations; for individual motors in excess of 10 HP (in exceptional cases, motors as large as 15 HP may be served upon approval by the Engineering Department); for commercial or industrial purposes; for other uses not specifically provided for by the provisions herein; or for resale service, except as provided for in Chapter 22 of the Commission Rules regarding the provision of electric service by landlords. Non-fossil energy sources caused by acts of nature such as wind or solar are permitted as supplement to Customer's energy requirement provided Company is granted the right to install, operate, and monitor special equipment at Company’s expense to measure Customer's load or any part thereof and to obtain any other data necessary to determine the operating characteristics and effects of the installation. In situations where special equipment is needed to assure safety, reliability, or metering accuracy, the installation of such equipment shall be at the Customer’s expense.
Source or Reference
https://www.duke-energy.com/-/media/pdfs/for-your-home/rates/dep-sc/leaf-no-503-schedule-r-tou-cpp.pdf?rev=5753bbf923654e8f8ee95e1c4a840e63
Source Parent
https://www.duke-energy.com/home/billing/rates/rate-options
Compensation for distributed generation
 
Basic Comments  
Applicability
Demand
Minimum
 
Maximum
 
Demand Units
kW
History (months)
 
Energy
Minimum (kWh)
 
Maximum (kWh)
 
History (months)
 
Service Voltage
Minimum (V)
 
Maximum (V)
240
Character of Service
Voltage Category
 
Phase Wiring
3-Phase
Load Factor
Minimum (%)
 
Maximum (%)
 
Averaging Window (Months)
 
History (Months)
 
Revision History
03/20/2026 05:05:44
Lbezerra
03/20/2026 05:05:59
Lbezerra (Approval)
Seasonal/Monthly Demand Charge Structure
Period
Tier
Max kW Usage
Rate $/kW
Adjustments $/kW
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
1
1
 
 
 
•
•
•
•
•
•
•
•
•
•
•
•
Time of Use Demand Charge Structure
Period
Tier
Max kW Usage
Rate $/kW
Adjustments $/kW
1
1
 
 
 
111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111
Weekday Schedule
Jan
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Feb
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Mar
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Apr
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
May
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Jun
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Jul
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Aug
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Sep
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Oct
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Nov
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Dec
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111
Weekend Schedule
Jan
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Feb
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Mar
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Apr
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
May
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Jun
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Jul
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Aug
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Sep
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Oct
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Nov
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Dec
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Lookback Months
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
 
 
 
 
 
 
 
 
 
 
 
 
Lookback Percent
 
Lookback Range (months)
 
Demand Window (minutes)
 
Demand Reactive Power Charge ($/kVAR)
 
Coincident Rate Structure
Period
Tier
Max Usage
Rate $/
Adjustments $/
1
1
 
 
 
111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111
Daily Schedule
Jan
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Feb
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Mar
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Apr
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
May
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Jun
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Jul
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Aug
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Sep
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Oct
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Nov
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Dec
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Other Demand Attributes
Demand Comments  
Tiered Energy Usage Charge Structure
Period
Tier
Max Usage
Max Usage Units
Rate $/kWh
Adjustments $/kWh
Sell $/kWh
1
1
 
kWh
0.12672
0.00833
 
2
1
 
kWh
0.28851
0.00833
 
3
1
 
kWh
0.08643
0.00833
 
Fuel Adjustments Monthly ($/kWh)
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
 
 
 
 
 
 
 
 
 
 
 
 
133111222113333311111111133111222113333311111111133111222113333311111111133111222113333311111111133333111111111111222111133333111111111111222111133333111111111111222111133333111111111111222111133333111111111111222111133111222113333311111111133111222113333311111111133111222113333311111111
Weekday Schedule
Jan
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Feb
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Mar
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Apr
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
May
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Jun
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Jul
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Aug
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Sep
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Oct
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Nov
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Dec
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
133111111113333311111111133111111113333311111111133111111113333311111111133111111113333311111111133333111111111111111111133333111111111111111111133333111111111111111111133333111111111111111111133333111111111111111111133111111113333311111111133111111113333311111111133111111113333311111111
Weekend Schedule
Jan
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Feb
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Mar
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Apr
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
May
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Jun
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Jul
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Aug
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Sep
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Oct
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Nov
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Dec
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Other Energy Attributes
Energy Comments Adjustments = Demand Side Management and Energy Efficiency + Excess Deferred Income Tax + Pensions Costs + Production Tax Credit rider + Storm Recovery| Leaf 601 (Fuel, env, avoided cap costs and dist energy) already included in rate Critical Pricing is $0.37518/KWh : The Company will call up to 20 Critical Peak Pricing (CPP) Days per calendar year. The number of Critical Peak Pricing Days permitted annually may be exceeded in the event of a system emergency that is expected to place the Company’s ability to provide reliable service to customers at risk. During Company-designated Critical Peak Pricing Days, the On-Peak Hours will become Critical Peak Hours. The Company has discretion to shift the Critical Peak Hours one hour earlier or later than the regular On-Peak Hours to provide flexibility for system operations; however, the total number of Critical Peak Hours per day will remain the same as the number of On-Peak Hours that would have otherwise occurred. Any shift in Critical Peak Hours will be reflected in the Customer notification. The designation of Critical Peak Pricing Days will be set daily and will be posted on the Company website as the official Customer notification. Additionally, the designation of CPP may be communicated to Customers by other means. The Company will notify Customer by 4:00 p.m. on the prior day for Critical Peak Pricing Days. In the case of a system emergency that is expected to place the Company’s ability to provide reliable service to customers at risk, the notification may occur no later than 30 minutes prior to the Critical Peak period.
Fixed Charge Information
Fixed Charge Units
$/month
Fixed Charge (First Meter)
23.63
Fixed Charge (Each Additional Meter)
 
Minimum Charge
 
Minimum Charge Units
 
Other Fixed Charge Attributes