View Rate

Basic Information
Utility Name
Baltimore Gas & Electric Co
Country
United States
EIA Id
1167
Monetary Unit
$
Rate Name
Residential Service (Schedule R)
Expert Has Verified
Yes
Is Default
 
Effective Date
01/01/2025
End Date
 
Supersedes
Residential Service (Schedule R)
Sector
Residential
Service Type
Delivery
Description
For use for the domestic requirements of: (1) A single private dwelling. (2) An individually metered dwelling unit in a multiple dwelling building. (3) One combination of two dwelling units within a building, if served through a single meter. (4) A dwelling occupied as the dwelling place of a church divine or of religious associates engaged in church duties. (5) A single dwelling within a building where the occupant has not more than 10 bedrooms to let or not more than 10 table boarders, or a combination of not more than ten. (b) For use, if on one property and served through a single meter, of a combination of the occupant's domestic requirements in a dwelling and his nondomestic requirements, provided that more than 50 percent of the connected load is for domestic purposes. (c) For use, if served through a separate meter, by appliances used in common by the occupants of not more than two dwelling units within a building.
Source or Reference
https://azure-na-assets.contentstack.com/v3/assets/blt71bfe6e8a1c2d265/blt04f5d9821e213aca/65a82ad0c2fe89000a8cfcf6/P3_SCH_R.pdf
Source Parent
https://www.bge.com/MyAccount/MyBillUsage/Pages/ElectricServiceRatesTariffs.aspx
Compensation for distributed generation
 
Basic Comments  
Applicability
Demand
Minimum
 
Maximum
 
Demand Units
kW
History (months)
 
Energy
Minimum (kWh)
 
Maximum (kWh)
 
History (months)
 
Service Voltage
Minimum (V)
 
Maximum (V)
 
Character of Service
Voltage Category
 
Phase Wiring
 
Load Factor
Minimum (%)
 
Maximum (%)
 
Averaging Window (Months)
 
History (Months)
 
Revision History
02/06/2025 10:36:23
Abalint
02/06/2025 10:37:29
Abalint
02/07/2025 04:15:45
Abalint (Approval)