View Rate

Basic Information
Utility Name
El Paso Electric Co
Country
United States
EIA Id
5701
Monetary Unit
$
Rate Name
Small General Service Rate
Expert Has Verified
Yes
Is Default
 
Effective Date
08/01/2022
End Date
06/14/2024
Supersedes
Small General Service Rate
Sector
Commercial
Service Type
Bundled
Description
This rate is available to all customers for lighting, power and heating service. Service under this rate shall be limited to customers who otherwise do not qualify for service under the Company's other rates, and which during the current month and the previous (11) month period, did not have maximum demands exceeding 15 kW in any two (2) consecutive months. The type of service available will be determined by the Company and will either be single or three phase at the option of the Company and at a standard Company approved voltage. All service will be taken at one point of delivery designated by the Company and at one of the Company's standard types of service. Electric energy will be measured by a single meter, or other measuring device. of each kind needed. The Fixed Fuel Factors recognize loss adjustments due to different voltage levels of service: Texas system - $0.022344, Transmission Voltage - $ 0.021561, Primary Voltage - $0.022124, Secondary Voltage - $0.022530
Source or Reference
https://www.epelectric.com/files/html/Rates_and_Regulatory/TX%20Rates/Section%201%20-%20Sheet%2005.0%20-%20Schedule%2002%20Small%20General%20Service%20Rate.pdf
Source Parent
https://www.epelectric.com/customers/rates-and-regulations/business-rates-and-information/texas-rate-tariffs-rules-and-regulations/texas-rate-tariffs
Compensation for distributed generation
 
Basic Comments  
Applicability
Demand
Minimum
 
Maximum
15
Demand Units
kW
History (months)
2
Energy
Minimum (kWh)
 
Maximum (kWh)
 
History (months)
 
Service Voltage
Minimum (V)
 
Maximum (V)
 
Character of Service
Voltage Category
 
Phase Wiring
Single and 3-Phase
Load Factor
Minimum (%)
 
Maximum (%)
 
Averaging Window (Months)
 
History (Months)
 
Revision History
06/08/2023 11:11:04
Spodgorn
06/08/2023 11:12:26
Spodgorn
08/14/2024 08:00:42
Abalint (Approval)