View Rate

Basic Information
Utility Name
City of Tacoma, Washington (Utility Company)
Country
United States
EIA Id
18429
Monetary Unit
$
Rate Name
Schedule G - General Service - City of Lakewood
Expert Has Verified
Yes
Is Default
 
Effective Date
04/01/2022
End Date
03/31/2024
Supersedes
Schedule G - General Service - City of Lakewood
Sector
Commercial
Service Type
Bundled
Description
For general power use where a demand meter is installed, for standby capacity to customers generating all or a part of their electric power requirements, and for intermittent use. The customer's actual demand as determined by Tacoma Power must exceed 50 kilovolt amperes or total connected load as estimated by Tacoma Power must exceed 65 kilowatts upon initial service energization. For customers providing all their own transformation from Tacoma Power's distribution system voltage, a discount for transformer investment and maintenance will be provided by reducing the monthly bill by 0.8 percent. For customers metered on the primary side of a transformer, a discount for transformer losses will be provided by reducing the monthly bill by 1 percent. These discount percentages are additive, and not compounded.
Source or Reference
https://www.mytpu.org/wp-content/uploads/All-Schedules-2022.pdf
Source Parent
https://www.mytpu.org/payment-billing/rate-information/power-rates/power-rates-schedule/
Compensation for distributed generation
Net Metering
Basic Comments  
Applicability
Demand
Minimum
 
Maximum
 
Demand Units
kW
History (months)
 
Energy
Minimum (kWh)
 
Maximum (kWh)
 
History (months)
 
Service Voltage
Minimum (V)
 
Maximum (V)
 
Character of Service
Voltage Category
 
Phase Wiring
 
Load Factor
Minimum (%)
 
Maximum (%)
 
Averaging Window (Months)
 
History (Months)
 
Revision History
12/11/2022 12:30:45
Spodgorn
12/11/2022 12:31:24
Spodgorn
07/29/2024 05:25:32
Abalint (Approval)